Week 6: Another week of hell.....

Week 6 has been a nightmare basically......You have bad weeks and good weeks, this week was a horrible week. Everything is moving way too fast, and if you don't get on the train, the shoot, you're out of luck. Basically, this week, we seemed to be working in reverse and felt more behind than we have ever felt before. Not to mention, the weather has been in the 100s, which makes it hard to function or sleep.....

Things that did and didn't get done:

Done: Demo and framing of kitchen. The new opening to the kitchen, great!! Exactly what I had envisioned.
Not done: What to do about the opening. Now that it's open, it looks so plain....molding or no molding?





Done: Completely gutted the bathroom. There are holes in the floor and ceiling.
Not done: Piping....why? Not because the crew is slacking, it's because we didn't do our homework and pick out a shower/bath valve in time.....oopsie, our bad..... (and for that we have frantically been searching for a vintage shower/bath faucet and valve. Frantically. It's crazy, we should have done this weeks ago. Negative points for the Man and I.)






Done: RCP (reflected ceiling plan) needed to be done, which again, I was delinquent on.....so I rushed and drew one out in AutoCAD.....I hate designing without putting much thought in it. The Man and I came to this decision because the lights are balance and centered. Plus we changed two recessed lights to pendants in front of the kitchen window......oopsie, again, last minute changes.
Not done: And now, we are late yet again in picking out the pendant fixtures....





Done: Wow, finding these shower and bath valves sure was a scramble!!! We literally scrambled around searching high and low for anyone who had these in stocks. Our GC asked for these several days ago and when we went to Home Depot/Lowes, we could not find anything we wanted!! Stupid move again, on our part. We should have ordered something "custom" like this ages ago. How dumb were we to think HD or Lowes would carry such a thing?! Ugh. Behind, behind, behind.
Not done: We had to expedite shipping on these suckers (sucks to be us, more $$ down the drain) and we are now waiting for it in Week 7.)




Done: All the tile has been selected except the backsplash in the kitchen........yes, we are last minute and the most wishy-washy people ever. Can't make a decision on anything....I think ultimately, we want to go with beautiful blue glass tile for the backsplash.
Not done: We haven't bought any tile!! Not one single tile....hope everything's in stock.....finger crossed (kicking myself in the bum!)





While the Man and I scramble around all week and weekend, this little guy is sound asleep ever so peacefully.....it's nice to be a hamster :)




Hoping Week 7 is better,
The Lady

Sunday, August 24, 2014

Week 4: Things are SORT OF lining in place

The beginning of Week 4 is starting off already much better than Week 3..... I can't believe it's almost been a month since we got the keys to this house!! Yikes....hardly any work has been done to the house, only mountains of estimates for this and that. In your mind, you have schedule set for the amount and type of work, but it never turns out that way afterall.....Some accomplishments of this week are:

- Termite work. Check. In theory, we should be termite free.

- Asbestos Sampling and Air Testing. Check. Came back NEGATIVE!!! That has to be the best news yet. We are more than relieved, we are so GRATEFUL that we don't have to live with asbestos in the air and all that popcorn ceiling we have been scrapping since Week 2 was not asbestos!! Woohoo!!

- Bathroom & Kitchen Renovation. Not checked, but we did finally decide on a GC (finally!!) and we're going with it! It comes with a hefty price tag but we're excited to start seeing some changes to our old dingy house. The Man and I designed the kitchen and bathroom together to make it our own, so we are excited to see what it unfolds these next few weeks. Projected time-frame is 2 months. And of course, there will be hiccups as any construction there always is. But for now, I the Lady, will like to stop for a split second and believe that everything will go smoothly.

- Structural foundation work. Not check. This is the only thing that really bothers us that we can't do much about....we are simply out of money to do any more to the house as of now. We have gotten multiple companies to come out and give us estimates, but it's just too much to swallow right now. Hopefully we will be okay with the structural foundation to put it off till next year!! Fingers crossed....

- Shopping......now for the shopping. Shopping for tile, shopping for vanities, toilets, tubs, sinks, etc......this in itself seems like the best part right? Nope, it's actually kind of a hassle. It's now coming down to the wire and things are going to happen quick when construction on the bathroom and kitchen begin. We have to start buying our materials and fixtures so we can all be on schedule. Joy. More deadlines. Am I back in school?!

(The Man's shoe....and us trying to decide on trim pieces)

(Potential floor tile for the kitchen)

(Gray Quartz for the kitchen counter)

(White octagon tiles for the bathroom/shower)


I guess shopping is much better than scrapping popcorn ceilings and taping off the walls and floors with plastic sheets.....One. Step. At. A. Time.

Moving along,
The Lady