Saturday, September 13, 2014

Week 6: Another week of hell.....

Week 6 has been a nightmare basically......You have bad weeks and good weeks, this week was a horrible week. Everything is moving way too fast, and if you don't get on the train, the shoot, you're out of luck. Basically, this week, we seemed to be working in reverse and felt more behind than we have ever felt before. Not to mention, the weather has been in the 100s, which makes it hard to function or sleep.....

Things that did and didn't get done:

Done: Demo and framing of kitchen. The new opening to the kitchen, great!! Exactly what I had envisioned.
Not done: What to do about the opening. Now that it's open, it looks so plain....molding or no molding?





Done: Completely gutted the bathroom. There are holes in the floor and ceiling.
Not done: Piping....why? Not because the crew is slacking, it's because we didn't do our homework and pick out a shower/bath valve in time.....oopsie, our bad..... (and for that we have frantically been searching for a vintage shower/bath faucet and valve. Frantically. It's crazy, we should have done this weeks ago. Negative points for the Man and I.)






Done: RCP (reflected ceiling plan) needed to be done, which again, I was delinquent on.....so I rushed and drew one out in AutoCAD.....I hate designing without putting much thought in it. The Man and I came to this decision because the lights are balance and centered. Plus we changed two recessed lights to pendants in front of the kitchen window......oopsie, again, last minute changes.
Not done: And now, we are late yet again in picking out the pendant fixtures....





Done: Wow, finding these shower and bath valves sure was a scramble!!! We literally scrambled around searching high and low for anyone who had these in stocks. Our GC asked for these several days ago and when we went to Home Depot/Lowes, we could not find anything we wanted!! Stupid move again, on our part. We should have ordered something "custom" like this ages ago. How dumb were we to think HD or Lowes would carry such a thing?! Ugh. Behind, behind, behind.
Not done: We had to expedite shipping on these suckers (sucks to be us, more $$ down the drain) and we are now waiting for it in Week 7.)




Done: All the tile has been selected except the backsplash in the kitchen........yes, we are last minute and the most wishy-washy people ever. Can't make a decision on anything....I think ultimately, we want to go with beautiful blue glass tile for the backsplash.
Not done: We haven't bought any tile!! Not one single tile....hope everything's in stock.....finger crossed (kicking myself in the bum!)





While the Man and I scramble around all week and weekend, this little guy is sound asleep ever so peacefully.....it's nice to be a hamster :)




Hoping Week 7 is better,
The Lady